David,
I've got a macro where I think my first SelectCurve(-1) is not reset by subsequent SelectCurve(n) commands, and is performing operations on ALL curves instead of the selected curve.
Here's a piece of what I have:
PostponeRedraw() 'for correcting and scaling data
SelectCurve(-1) 'from chk vlv test
EditOperateX("x/3000") 'data collection rate was 3000/sec
XAxisLabel("Time, sec")
SelectCurve(1) 'first curve to import is AiCoInT
EditDecimate(0,1,25) 'do not need so many points
EditOperateY("y-273.15") 'K to C conversion (some were F to C)
After that SelectCurve(-1) command, and the operation on the X axis, the next SelectCurve(1), when I wanted the following operation to apply to JUST curve 1, instead it operates on all curves, not just curve 1. At least the EditDecimate worked on all curves, but the EditOperateY seemed to work correctly on just curve 1. So is there something wrong with the EditDecimate command that it is ignoring the SelectCurve command?
Jon
SelectCurve(-1) or EditDecimate error
Moderator: DPlotAdmin
- DPlotAdmin
- Posts: 2312
- Joined: Tue Jun 24, 2003 9:34 pm
- Location: Vicksburg, Mississippi
- Contact:
Yes, will fix it before the next release. Thanks for pointing out the problem.So is there something wrong with the EditDecimate command that it is ignoring the SelectCurve command?
Visualize Your Data
support@dplot.com
support@dplot.com